Now that we have a server it is time to move.

We have a lot to get to grips with very quickly.


PROPOSAL: Server work day

→ work out what needs to be done


<sidetrack> last week, everything was out of our control again - (see email) → total frustration

That's probably the very last try we get to do this


We need to get our stuff back:

DNS: Someone apart from Jason needs to have access

TRAC: Database dumps of needed to set up again on new FSF box

Forum: probably running on aktivix would be a better option → DB dump needed


save: wiki & list


We have to it now and right.

It will take a lot of person hours. Do we have these?


It's serious. We hadn't any real progress for a long time and people are deserting and declaring BLAG as dead.


weyasey:

agreed on the points raised. but ppl will be coming back when a new version of BLAG is released. it's well-known in a core-user group.

They will come back when everything is up and running again. the blaggers know about our problems and although they cannot help technically, once a new release comes, they'll do as well.


r7:

90002 needs to be released soon or sooner

This requires an intesive period of a steep learning curve for all of us.

TRAC should be going wild with any imaginable ideas.


immediately: -repo building stuff

-rsync the repo back and learn how update scripts work

-get updated to all the latest packages


  • FSF box will get all the stuff from jebba's dev box
  • we then look at the development scripts


server work day

*copy jebba box > new box
*look at update scripts to see if they work still
*update box with newer packages
*we can also create a new "built by blaggers testing" repo
 we can start to feed these in for 90003 i feel
 but for 90002, newer versions of what we've got upstream
 and outstanding trac items (dependency issues)
*for iso, leave existing pavckage list as far as possible 
*test roll
 *from scratch install
 *dist-upgrade install
 *from cd upgrade
*tweak
*release


SERVER WORK DAY IS PROPOSED TO BE SATURDAY THE 27TH OF JUNE

What do we have to figure in advance?

Prepare for tool usage (pungi)

Send SSH-keys to r7 in order to get access to server and GIT.

→ discuss on ml

Homer & TRAC